Contractor
Conlon Construction Limited
Works
Supply and Install package
Project Value
Completed
December 2016
Project Description
Our works at Gospel Hall, Carnforth were split in to 2 phases. The first phase consisted of timber framing and insulating the perimeter walls tight up to the curved roof structure. The second phase consisted of the timber joists for the service floor fixing to steel purlins, insulating, netting and flooring. On the ground floor timber stud walls were installed and insulated ready for other trades. Once boarded and skimmed we supplied and installed Ash veneered door sets, ironmongery, ash slatted panelling throughout main hall and side corridors, bespoke water fountain units, staging, staircases, IPS duct work, toilet cubicles, vanity units and islands, ash skirting and architrave, bespoke cost hook boxes and pipe encasements.
About LN Joinery
Recent Works Completed
Address
64a Main Road, Galgate, Lancashire, LA2 0LB.
(0)1524 751009
Company No. 08247641
VAT No. 150143752